Wednesday, September 12, 2012

Day 201

Shop built cabinets delivered today, installation set for tomorrow morning. The brown units will be wall color, the grey units need to be protected immediately from the drywall sanding that is about to occur. This is not the preferred sequence, but sometimes work-arounds are required to stay on schedule.
The clerestory windows; view to the east with the sunlight coming from the western sunset. Notice that the bottom of the window frame is not visible. Looking back, I hate to think about the amount of time spent to assure a viewer could not see the bottom of the clerestory windows. Sweating (and belaboring) details to the nth degree. 
The (soon to be screened) balcony just before sunset, the screen's framing is in place. The only scaffolding remaining around the house is here in front. The screen will be placed after the cosmetic coat is applied to the floor and the city-required railing is installed.