Thursday, November 15, 2012

Day 266

Clerestory ceiling at night, illuminated by 1700 miniature LED lights.
Operating water feature, behind raised beds.
Kitchen coming together. 
Hardwood floor installation begins tomorrow. 
And one step back; the electrician discovered a line that was not connected. So he's punching holes in the drywall ceiling hunting for ... well something.

No comments:

Post a Comment