Dumpster gone, replaced by fence bin for trash; front balcony screen installation scheduled for tomorrow.
Testing a couple yellow paint samples for the front door.
Carport is shaping up, ceiling fans installed & paint nearly complete. Beginning to show the intended "pavilion" feel.
"Water feature" CMU (cinder block) structure nearly completed.
View from Master Bedroom.
Water wall (left side) tile application underway,  sheer nozzle waterfall on right. 
Electric fixtures almost completely installed throughout house, also site built cabinets were stained over the weekend.

First floor concrete finishing underway. The interesting texture is actually the first application which was unacceptable and has been ground off. Attempt 2 underway.  :(

This group of wall cabinets delineates between the kitchen and the dining room.