Backyard water feature now being installed. |
In this picture almost everything is complete - well, except for the bath fan vent cap and cleaning the windows :) - The original point of the pic is to show the gutters are done! |
Note the screen porch framing is installed AND the dumpster is gone! |
Final finish to the screened porch floor. |
Fence, storm drains and "flatwork" (6" and 4" thick concrete such as driveway, sidewalks, extra parking and part of the ground level patio). |
Master Bath tile is almost complete; all other tile work is complete. |